Who this checklist is for
-
Step 1: Write down the room and the occupancy pattern before you open a catalog
-
Step 2: Lock the motion sensor spec sheet before anyone quotes a price
-
Step 3: Get protocol and control compatibility confirmed in writing
-
Step 4: Do the coverage math yourself
-
Step 5: Check the LED load side, not just the switch side
-
Step 6: For bulk spotlight orders, verify batch consistency
-
Step 7: Test a physical sample in the actual space (the step most people skip)
-
Step 8: Reconcile carton counts and pallet math before confirming quantity
-
Step 9: Confirm certifications, labels, and energy claims with documentation
-
Notes and mistakes to watch for
Who this checklist is for
If you're a distributor, contractor, or OEM buyer placing bulk orders for lighting controls — motion sensor switches, LED recessed lighting, bulk spotlight fixtures, or Zigbee controls — this is the checklist I run before any order over roughly $2,500 gets submitted.
I've been handling lighting control and sensor orders for six years. Along the way I've made (and documented) 11 significant mistakes, totaling around $6,800 in wasted budget. Now I keep our team's pre-order checklist so other people don't repeat them.
Nine steps. Nothing on here is exotic. The one most people skip is Step 7 — I'll flag it when we get there.
Step 1: Write down the room and the occupancy pattern before you open a catalog
Most motion sensor problems start because the buyer picks the product first and matches the space second. Flip that order.
Before you look at a single part number, write a one-line profile for every controlled area:
- Fast transit (corridors, stairwells, loading docks) — basic PIR usually covers this if the mounting height matches.
- Low motion (offices, workstations, restrooms with stalls) — passive infrared alone will drop people who sit still. Ultrasonic or dual-technology is the safer call here.
- High ceilings (warehouse aisles, gyms) — you need a lens rated for that mounting height, not just a high coverage number on the box.
- Hostile sensing conditions — HVAC diffusers, glass partitions, and cold storage all interfere with different sensing technologies in different ways. Flag these now, not after install.
That's a 20-minute exercise. It saves weeks later.
Step 2: Lock the motion sensor spec sheet before anyone quotes a price
Price conversations before spec conversations are how you end up comparing two products that aren't actually the same product.
Ask for a written spec sheet that covers: coverage diameter (at a stated mounting height and sensitivity setting), mounting height range, field of view, voltage, operating temperature, time delay range, sensitivity adjustment, and what loads it's rated to switch.
If a sheet says "coverage: up to 40 ft" with no mounting height and no sensitivity setting attached, that's a marketing number, not a specification.
I learned this the hard way in 2017. I approved a 300-piece bulk spotlight order without reading past the first page of the spec sheet. The fixtures arrived with a beam angle about 15 degrees narrower than what our project required. $890 in rework, plus a one-week delay on an install we'd already scheduled. Everything since then goes in writing first.
Step 3: Get protocol and control compatibility confirmed in writing
Zigbee wholesale orders are where this bites hardest. "It works with that" is not documentation, and a nod from a sales rep is not a test result.
Before you commit volume, confirm in writing:
- Which Zigbee profile or version the device runs (Zigbee 3.0 vs. a manufacturer-specific profile matters enormously here).
- Pairing method and whether a gateway, hub, or coordinator firmware version is required.
- Whether the device acts as a router/repeater or an end device only — mesh behavior changes with node count.
- How many nodes the controller or gateway actually supports in practice, not on a datasheet.
Here's my boundary on this one: I can only speak to the ecosystems I've integrated. If you're building on a platform I haven't touched, the compatibility picture might look different, and you should treat my numbers as a starting point rather than a guarantee.
Step 4: Do the coverage math yourself
Coverage is not the same as ceiling height, and it's not the same as the number printed on the front of the box.
For each area, work out: mounting height, expected walk speed, sensitivity setting, and the realistic detection diameter at that height. A person moving at a normal walking pace triggers a sensor at a shorter distance than a person walking slowly. That gap is real, and most datasheets quietly leave it out.
Sketch the room. Mark fixture positions. Mark where people actually enter and move. If a sensor's detection pattern doesn't line up with that path, no amount of tuning fixes it later.
Step 5: Check the LED load side, not just the switch side
Pairing Lutron LED recessed lighting — or any LED fixture — with a dimmer or sensor switch is where paper compatibility falls apart.
Confirm all of these before ordering:
- Minimum and maximum load ratings for the control device.
- Whether a neutral wire is required.
- Dimming curve and driver compatibility list.
- Inrush current behavior when multiple LED drivers share one controller.
That last one is the sneaky one. LED drivers pull a large surge at startup. Put eight or ten of them behind a single relay and it'll cycle far sooner than its rated life suggests.
Honestly, I've never fully understood why some vendors stay vague about minimum load on their spec sheets. My best guess is that the compatibility matrix across driver families is a nightmare to maintain, so it gets trimmed. Whatever the reason, get the matrix before you buy.
Step 6: For bulk spotlight orders, verify batch consistency
Bulk spotlights look like a commodity item until you install 12 of them in one ceiling and notice a 200–300K color temperature spread between fixtures. On a finished ceiling, everybody notices.
Ask for these before you confirm:
- A binning or color-sorting report per production batch.
- Written beam angle tolerance.
- An acceptance standard for optical defects.
And ask the direct question: "Will you ship from a single production batch?" If the answer is "we'll ship whatever's in stock," expect a mixed batch and plan accordingly.
This is also where the quality-perception argument lands. What your customer sees on the ceiling is the only version of your company they'll remember. Saving a few cents per fixture on unsorted stock shows up in the client's first impression, and that impression doesn't come back.
Step 7: Test a physical sample in the actual space (the step most people skip)
This is the one that gets cut when timelines get tight. Everything looks fine on paper, then the environment kills half the plan: HVAC airflow confusing a PIR sensor, glass partitions throwing off temperature differentials, high racking sending ultrasonic reflections in the wrong direction. None of that shows up in an office test.
Our process:
- Install 2–5 units in one representative area.
- Run them through 72 hours of real occupancy.
- Log results by location, date, and test condition — not just "seemed fine."
Looking back, I should have paid for physical sample testing on my very first order. At the time, I was trying to protect a $200 line item on the budget. That decision cost about $1,200 in rework and expedited freight.
Step 8: Reconcile carton counts and pallet math before confirming quantity
Quantity errors on bulk orders are more common than most buyers assume. Here's what's on our count sheet:
- Units per inner box vs. units per master carton.
- Cartons per pallet, and pallet footprint.
- Spare units — we typically add 1–2% on critical part numbers.
- Total weight and cubic volume, cross-checked against the freight quote.
- Labeling and barcode requirements on every carton.
On one 2,400-piece sensor order, the vendor packed by inner box instead of master carton. We miscalculated the pallet count and ate about $340 in LTL freight. Small, but these stack up across a season.
Step 9: Confirm certifications, labels, and energy claims with documentation
UL, ETL, or an equivalent listing is table stakes for most distribution channels now, and a lot of projects require Title 24 or DLC conformity on top of that. Get the certificates, not the logo files.
On energy claims, the ceiling is set by regulation. Per FTC advertising guidance (ftc.gov), claims must be truthful, not misleading, and substantiated with evidence. In plain terms: if a supplier stamps "saves 40% energy" on a bulk spotlight or sensor, ask which baseline, tested by whom, and where the report is. If nobody can produce it, that claim doesn't go on your quote sheet or your catalog — no matter how good the product is.
Notes and mistakes to watch for
A few things that aren't steps, but decide whether the steps actually help:
- Don't let a quote expiry force the decision. I once had about two hours to confirm a rush processing window. Normally I'd get three quotes and a sample confirmation. There was no time, so I went with our usual vendor on trust alone. It worked out — but it worked out by luck, not process.
- Build buffer into the spec deadline, not just the ship date. Samples, written compatibility confirmations, and binning reports all take longer than the sales rep implies.
- One undocumented "it should work" assumption is enough to sink an order. If it isn't in an email or a spec sheet, it doesn't exist.
I can only speak to our situation — a mid-size B2B operation with fairly predictable ordering patterns. If you're seasonal with sharp demand spikes, or you're sourcing across multiple regions with different certification regimes, the calculus shifts and some of these steps need to be weighted differently.
That said, the checklist isn't clever. It's just consistent. We've caught 47 potential errors with it over the past 18 months, and the ones that got through were the ones where somebody skipped a step because the order "looked simple."